Recent News and Updates from the FourStar Project
The FourStar Critical Design Review (24MB PDF) - September 2006
FourStar Poster Presented at the January 2008 AAS Meeting (4MB PDF)
Second Vacuum Test - 2008 (Flash Required)
Initial Optical Alignment - December 2008 (Flash Required)
Installation of Racks and Prep for Initial Cold Test - February 2009 (Flash Required)
Assembly of L1/L2 Cell and Camera Module (L3-L6) - February 2009 (Flash Required)
Assembled Dewar Being Filled with LN2 on First Cool Down - March 2009 (Flash Required)
Miscellaneous Photos from the Lab of FourStar Testing Spring/Summer 2009 (Flash Required)