IMACS PSR documentation:
The IMACS Pre-Ship Review was held in Pasadena on 5/28/03.
Documents from the review are available below:
PSR Committee
Report
Reply to the
PSR committee report
Agenda (txt)
Review Committee (txt)
Project team and contributors
(PDF)
Operating modes and
requirements (PDF)
Overview of IMACS sub-systems
(PDF)
Overview of Electronics (PDF)
Overview of Software (PDF)
CCDs and science array (PDF)
Performance and testing
(PDF)
Installation schedule
(PDF)
Shipping plan (PDF)
Commissioning plan (PDF)